Switch Faceplate Wiring
Front-panel view of every switch and router at both sites across all seven build phases — from flat bootstrap through Kubernetes — with per-port role color coding and wiring tables.
Front-panel wiring diagram for all switches and routers at Site A (10.10.0.0/16) and Site B (10.20.0.0/16). Select a build phase to see which ports are active, what plugs into each, and which connections are newly activated in that phase. Hover or tap a lit port for the wiring instruction.
Front-panel view of every switch and router at both sites, with each port labeled by what plugs into it. Site A 10.10.0.0/16 (mgmt / ZFS / PBS) · Site B 10.20.0.0/16 (Ceph / K8s). Pick a phase below. Hover or tap a lit port for the wiring instruction; the table under each device lists the same.
Faceplates use verified port counts: E200-8D 2×10GBASE-T + 2×1GbE + IPMI; sa-sw-01 16×10GBASE-T (15–16 combo SFP+); sb-sw-01 44×10GBASE-T + 4 dedicated SFP+; US-XG-6POE 4×10G RJ45 + 2×SFP+; USW-24-PoE 24×1G + 2×SFP; UXG-Max 1+4×2.5G; USG-PRO-4 2×RJ45 + 2 combo. Wiring per 04-site-a-port-map-switching.md, 14-site-b-port-map-switching.md, 13-build-phases.md.
Port Wiring Guide
Interactive NIC-port-to-switch-port cabling reference for every build phase at Site A and Site B — step through Phase 0 bootstrap through Phase 6 Kubernetes.
Network Topology Map
Interactive SVG map of both sites: the ISP-to-host spine, UniFi WAN-transit branch, and the WireGuard tunnel joining OPNsense-A and OPNsense-B. Click any node to open its docs.