Interactive Tools

Build Phases Explorer

Interactive topology phases for Site A's OPNsense-routed Layer 2 migration and Site B's unchanged OPNsense/USG campaign.

Step through Site A's A0-A11 campaign from the observed UCG Max/XG6 bootstrap island to OPNsense, the three-switch L2 fabric, sa-pve, services, and the application platform. Site B is parked. Target phases are not evidence of deployment.

DECISION-GATED SITE A CAMPAIGN

Site A Clean-Slate Phases

Target not yet production

A0: Preserve the Rollback Island

Document and export the working UCG Max, XG 6 PoE, and U7 Pro XGS network before touching the target.

Export UCG and switch configsRecord WAN, SSIDs, reservations, and cablesLabel every device and NICKeep a physical rollback map

Site A · 10.10.0.0/16

ONT → UCG Max → XG 6 PoE → U7 Pro XGS

Site B · 10.20.0.0/16

Parked and unchanged

Site A invariant: OPNsense owns every routed gateway, DHCP scope, and stateful policy boundary. The three switches stay L2-only; VLANs 253/4040 are absent and VLAN 999 is an unrouted native sink.